Pipeline Construction
Spread 1 – from Cushing, OK to Hewitt, OK
Installation of approximately:
- 140 miles of new 16” mainline pipeline
- 168 bores (15,554’)
- 28 HDDs (38,376’)
Spread 3 – from Sherman, TX to Longview, TX
Installation of approximately 139.4 miles of 16” mainline pipeline including:
- 16 directional drills (25,353’)
- 16 mainline valves
- 5 mainline check valves
- 174 road bores totaling 16,690’
- 1 launcher
- 1 receiver