Hydrostatic Testing

"Strike's Hydrostatic Testing provides a turnkey service, performing every single function on a mandated integrity testing job from beginning to end."

Strike Testing was established in 2005 to meet the hydrostatic testing needs of the pipeline industry. Today, Strike is among the very few contractors in the industry that offer complete construction capabilities and a professional in-house integrity group.

With a simple phone call, we can dispatch highly trained hydrostatic testing crews along with specialized teams for "make ready" and leak repair from any of our regional offices. We have the capability to test any size pipeline, from the smallest fabrication to cross-country mainlines, and have performed thousands of tests over the years on pipelines ranging from 4" to 42" pipe. With over $4 million in testing equipment assets, our dynamic fleet provides our customers with bottom line cost savings on every job.

We also furnish our clients with the most detailed test documentation available and maintain both electronic and physical archiving should they ever be required. Each engineered test report includes digital imagery and GPS coordinates for all relevant pipeline features.

Strike Hydrostatic Testing Services Include:

  • Make ready - Mechanical preparation and remedial work for testing operations
  • Fabrication - Install pigging facilities, valve settings, metering facilities, and temporary or permanent modifications to allow testing
  • Chemical cleaning - Progressive cleaning solutions using pigs and special chemicals to clean lines
  • Line fill, test and dewater - Late model, specially designed equipment allows pump performance to be matched to any project in the country
  • Dehydration and mechanical cleaning - Drying to ultra-low dew point temperatures and cleaning lines to high-purity levels
  • Leak and failure repair - High-tech, advanced leak detection methods and replacement and/or repair of defects identified during testing activities
  • Tie-ins and recommissioning - Re-establishing pipeline operations following testing activities